What is a Phase 1 Desk Study?

What is a Phase 1 Desk Study? A Phase 1 Desk Study is a preliminary [...]

What is a Site Investigation?

What is a Site Investigation? A Site Investigation is an intrusive investigation aimed at assessing [...]

Hierarchy of Drainage – National Planning Practice Guidance

The Hierarchy of Drainage – National Planning Practice Guidance The National Planning Practice Guidance sets out [...]

Wolves FC Training Ground Extension

Wolves FC Training Ground Extension Case Study JOB: WOLVERHAMPTON WANDERERS FC TRAINING GROUND, WOLVERHAMPTON, WEST [...]

Canterbury Hall Student Living Complex

Canterbury Hall Student Living Complex Case Study JOB: CANTERBURY HALL, GARSTANG ROAD, PRESTON, LANCASHIRE ARCHITECT: DAVID [...]

Site Investigation for Scunthorpe United’s Proposed Stadium (Large Scale)

JOB: SCUNTHORPE UNITED FC’S PROPOSED STADIUM – IRON ARENA CLIENT: BUCKINGHAM GROUP CONTRACTING LIMITED DATE: [...]

Knottingley Hydropower Station Site Investigation

JOB: KNOTTINGLEY HYDROPOWER STATION, FORGE HILL LANE, KNOTTINGLEY, WEST YORKSHIRE STRUCTURAL ENGINEERS : JNP GROUP [...]

PNE Training Ground

Foundation Design and Earthworks (Medium Scale)  – Preston North End’s New Training Ground JOB: PRESTON [...]

Waste Removal – Hackney, London

Removal of Waste from Site – Hackney Substation, London JOB: HACKNEY SUBSTATION, LONDON CLIENT: NATIONAL [...]

Subsidence Ground Investigation

Subsidence (Failed Foundations) Ground Investigation in Northwood, Greater London, Caused by The Shrinkage of Founding [...]

Foundations (small scale)

Foundation Design (Small Scale) – Speke, Liverpool JOB: SPEKE, LIVERPOOL DATE: DECEMBER 2016 COST: ~ [...]