What is a Phase 1 Desk Study?
What is a Phase 1 Desk Study? A Phase 1 Desk Study is a preliminary [...]
What is a Site Investigation?
What is a Site Investigation? A Site Investigation is an intrusive investigation aimed at assessing [...]
Hierarchy of Drainage – National Planning Practice Guidance
The Hierarchy of Drainage – National Planning Practice Guidance The National Planning Practice Guidance sets out [...]
Wolves FC Training Ground Extension
Wolves FC Training Ground Extension Case Study JOB: WOLVERHAMPTON WANDERERS FC TRAINING GROUND, WOLVERHAMPTON, WEST [...]
Canterbury Hall Student Living Complex
Canterbury Hall Student Living Complex Case Study JOB: CANTERBURY HALL, GARSTANG ROAD, PRESTON, LANCASHIRE ARCHITECT: DAVID [...]
Site Investigation for Scunthorpe United’s Proposed Stadium (Large Scale)
JOB: SCUNTHORPE UNITED FC’S PROPOSED STADIUM – IRON ARENA CLIENT: BUCKINGHAM GROUP CONTRACTING LIMITED DATE: [...]
Knottingley Hydropower Station Site Investigation
JOB: KNOTTINGLEY HYDROPOWER STATION, FORGE HILL LANE, KNOTTINGLEY, WEST YORKSHIRE STRUCTURAL ENGINEERS : JNP GROUP [...]
PNE Training Ground
Foundation Design and Earthworks (Medium Scale) – Preston North End’s New Training Ground JOB: PRESTON [...]
Waste Removal – Hackney, London
Removal of Waste from Site – Hackney Substation, London JOB: HACKNEY SUBSTATION, LONDON CLIENT: NATIONAL [...]
Subsidence Ground Investigation
Subsidence (Failed Foundations) Ground Investigation in Northwood, Greater London, Caused by The Shrinkage of Founding [...]
Foundations (small scale)
Foundation Design (Small Scale) – Speke, Liverpool JOB: SPEKE, LIVERPOOL DATE: DECEMBER 2016 COST: ~ [...]